Park more cars in less building.
Automated parking consultants · New York
A.P.T. Parking Technologies advises developers, architects and municipalities on the selection, design, engineering and installation of automated parking garages.
Fig. 02 · Same cars, less building
Twelve cars. Two garages.
A conventional garage spends most of its volume on people: ramps, drive aisles, stairwells and the headroom a driver needs. An automated garage spends it on cars.
Fig. 03 · The process
Drive in. Walk away.
- Step 01
Drive in
The driver pulls into a bright, well-monitored entry cabin, turns off the engine and walks away.
- Step 02
Scan
Sensors measure the height, length and width of the vehicle and confirm no one remains inside the cabin.
- Step 03
Store
The parking equipment carries the vehicle to a computer-assigned space in the sealed storage vault.
- Step 04
Retrieve
On request the vehicle returns to an exit cabin. Nothing ever touches it, and its engine stays off throughout.
Benefits
Built for the building, not the driveway.
Space saving
Efficient space utilization allows greater development size.
02Vehicle security
Your vehicle is stored as safely as if it were in a bank vault.
03Personal safety
Parking turned into a pleasant experience.
04Environmentally friendly
“Green” buildings and sustainability.
05Design flexibility
Right for new construction or renovation.
06Made in the USA
No currency-exchange risk and no overseas shipping delays.
First-class references
7 garages. 917 spaces.
- Co-author of the National Parking Association’s “Guide to the Design and Operation of Automated Parking Facilities”, the authoritative reference for architects and engineers.
- Member of the select group of industry experts who drafted the National Fire Protection Association’s fire-suppression standard for automated parking garages (NFPA 88A).
- Former Chairman & President of the Automated & Mechanical Parking Association, the industry trade association.
Your next building
Get the space back.
Talk to us before the garage is designed. Early decisions on system and layout decide how much of the building you keep.









